Solar PV Installation Projects

Blandford Forum

Blandford Forum Solar PV

1.84kw, Yingli 230w x 8, SMA 1700 inverter, K2 mounting, 2 rows, 1 string

Picture shows roof hooks fitted ready for rails, a good south facing position with no shading, and the sun was out for the whole two days!

Gerrards Cross

Gerrards Cross Installation

3.33kw, ET Solar 185 x 18, SMA SB inverter, K2 Mounting, 2 rows, 2 strings

This was a large array on the rear of the house, south facing and with no shading, customer was generating over 2.3kw almost all the preceding days, not bad for October.

Need Advice?

If you need advice on either Solar PV or general electrical work please contact me directly, its free and without obligation.

Westec Tim Briar

Tim Briar
Westlec Manager

Yate (near Bristol)

1.84kw, Yingli 230w x 8, SMA SB1700 Inverter, K2 Mounting, 2 rows, 1 string

South South/East facing roof, trees had been cropped and although still look big they do not shade array, continuing cropping when required will be needed to ensure they stay in trim though. Array has been giving excellent results and output is above forecast, customer is very happy.

Domestic Electrician Weston Domestic Electrical Engineer Yate Solar PV Installation

Testimonials

References from previous customers available on request, much of our work is through recommendation!

Standard Terms and Conditions

Contact Us

If you are interested in having Solar PV installed please contact us for a free site survey and quotation.

Procedure

1. You request quotation

  • We visit you and carry out a no obligation free site survey.
  • We provide a free quotation including comprehensive output data and financial returns.

2. You accept quotation

  • We arrange a mutually acceptable date to install.
  • Structural report from qualified engineer
  • A 25% deposit is escrowed
  • Scaffolding is arranged by us and erected a week before works commence.
  • Install is carried out, usually within two to three days depending on size of system.
  • System is commissioned and a full handover pack of certificates and guarantees is provided.
  • System is registered with the MCS allowing FIT payments.
  • We register the system with the local network provider (DNO)

3. You pay the 75% balance upon commissioning

  • Scaffolding is removed

4. You contact your energy supplier and start claiming your feed in tariff payments